1. Prepare the surface: Clean and ensure the surface is dry.
2. Plan the layout: Determine the panel arrangement and make necessary markings.
3. Cut panels: Trim the panels to fit the installation area if needed using cutter.
4. Apply adhesive: Use recommended adhesive - Maxbond on the back of the panel.
5. Install panels: Align and press the panel firmly onto the surface.
Application Scenario
Our services
We are a specialized new environmental protection building materials manufacturer, engaged in PU and flexible stone series solutions, not only to provide equipment production, manufacturing, but also to provide customers with product technology transfer, experience teaching;
In addition, we also support new customers to build factories, select and match suitable product lines; Solve every customer production problem.